Call Now
Website
Call
Business Details
14 Years
experience
HVAC Control Systems in Bristol
Established in 2012, Kinetic Systems delivers energy and control solutions with over 25 years of combined expertise in BEMS and HVAC systems. Our team specialises in designing, installing, and commissioning control systems for mechanical engineering projects, ensuring compliance with consulting engineers' specifications. We prioritise safety, efficiency, and client collaboration, supporting projects from initial design through to handover.

Our Trend-approved status reflects our commitment to high standards in system integration, serving clients across the South West. With a focus on prompt, competitive responses, we aim to exceed expectations through technical excellence and a deep understanding of HVAC plant operations.
Services
BEMS Design Control Panel Installation Project Mobilisation Commissioning Electrical Installation
Details
  • Year established: 2012
Highlights and features
  • We offer 25+ years of combined experience in HVAC control systems.
  • Our team holds Trend-approved Systems Integrator certification.
  • We provide prompt, competitive responses aligned with engineering specifications.
  • We ensure compliance with safety and quality standards across all projects.
  • Our expertise spans project design to commissioning and handover.
Associations and certifications
  • Trend Approved Systems Integrator
Services
BEMS Design
We design Trend Building Energy Management Systems tailored to project requirements. Our approach ensures energy efficiency, compliance with engineering standards, and seamless integration with HVAC plant. Clients benefit from reduced operational costs and optimal building performance.
Control Panel Installation
Our in-house control panel design and installation services ensure precision and reliability. We align systems with project specifications, minimising rework and delays. This service guarantees long-term functionality and compliance with industry regulations.
Project Mobilisation
We initiate projects within two working days of order receipt. This includes gathering plant data for electrical load calculations and valve sizing, ensuring accurate system design and timely execution.
Commissioning
Our commissioning process involves point-to-point checks and field device testing. We simulate operational conditions to validate system performance, ensuring safety and functionality before client handover.
Electrical Installation
Approved subcontractors carry out electrical installations to current legislation. This service ensures safe, durable connections for control systems, supporting reliable HVAC operation and compliance with regulatory standards.
Questions
What HVAC control systems do you specialise in?
We specialise in Trend Building Energy Management Systems (BEMS) and custom control panel solutions for commercial and industrial projects.
How long does project mobilisation take?
We begin projects within two working days of receiving your order, ensuring swift mobilisation and data collection.
Are you certified for system integration?
Yes, we are a Trend-approved Systems Integrator, meeting high standards for workmanship and system performance.
Do you handle commissioning and testing?
Yes, we conduct comprehensive commissioning, including point-to-point checks and operational simulations, to ensure system reliability.
What areas do you serve?
We operate across the South West, including Bristol, Bath, Penzance, and Swindon.